1-Any Management Problem?

2-Identify process chart?

3- Use SWAT analysis; opportunity, Weakness, Strength, Threats.

4- What are performance indicators?

5- Any overlap between functions

6- What are the critical aspects in sequence from high to low?

7- What type of risks involves?

8- List down important facts and link it with process chart?

9-What are your Assumptions?

10- analysis of control chart ?

some information from case and equations

number of sample =5 ;

CPk= min ((mean- LCL)/3 sigma, (UCL -mean)/3 sigma)

Cp = (USL-LSL)/ 6 sigma

Use table 13.5

Identify the problems for 3 shifts ( figure 13.43, 13.44, 13.45) which they identify control limit and link them to each other.

What are the related of control limit for 3 shifts and  Upper and lower control specification of 4.980 and 4.920.

11- Process Capability analysis and Central limit theorem?

12- What are the solutions ( Short term and Long term)

13-Criteria of evaluation

Conclution

( if you using excel , Please attached soft copy when you submit the report)

 

 

 

 

 

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!