1-Any Management Problem?
2-Identify process chart?
3- Use SWAT analysis; opportunity, Weakness, Strength, Threats.
4- What are performance indicators?
5- Any overlap between functions
6- What are the critical aspects in sequence from high to low?
7- What type of risks involves?
8- List down important facts and link it with process chart?
9-What are your Assumptions?
10- analysis of control chart ?
some information from case and equations
number of sample =5 ;
CPk= min ((mean- LCL)/3 sigma, (UCL -mean)/3 sigma)
Cp = (USL-LSL)/ 6 sigma
Use table 13.5
Identify the problems for 3 shifts ( figure 13.43, 13.44, 13.45) which they identify control limit and link them to each other.
What are the related of control limit for 3 shifts and Upper and lower control specification of 4.980 and 4.920.
11- Process Capability analysis and Central limit theorem?
12- What are the solutions ( Short term and Long term)
13-Criteria of evaluation
Conclution
( if you using excel , Please attached soft copy when you submit the report)