#Sales Offer!| Get upto 25% Off:

Rank the Machine Centres in decreasing order of downtime duration. Trend individual machine downtime history on a monthly basis for entire duration (10% + 5%) A2. For the top three machine centres (from answer 1), generate two PARETO charts for each machine. (20%) The PARETO charts shall be 1. Cause of downtime vs. downtime events 2. Cause of downtime vs. downtime duration. EG 5220: Assessment 3 A3. For the most affected machine centre identified in Answer 1, analyse the causes of downtime from information available in the fields “Reason” and “Comments”. Explain your findings. (10% + 5%) A4. Generate two parameter Weibull Model for the three machine centres with highest downtime duration. Explain relative Reliability performance (15% + 5%)

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!