#Sales Offer!| Get upto 25% Off:

A small electronics company assembles power supplies for use in computers, printers and FAX machines. They want to set up an assembly line to make their operation more efficient and plan to use

line balancing with the incremental utilization heuristic. The demand for power supplies is 150 per hour, and the productive time per hour is 45 minutes. The following table provides details on their operation (with time in minutes):

Time to Perform Task Task that must immediately precede
A 1.12
B 0.68 A
C 0.22 A
D 0.18 A
E 0.86 B,C
D 0.18 A
E 0.86 B,C
F 0.44 D
G 1.24 E
H 0.70 F,G
I 0.42 H
J 1.14 H
K 0.66 I,J

1- What is the cycle time?

2- What is the theoretical minimum number of workstations?

3- What tasks go into the first workstation?

4- How many workstations are needed for the entire line?

5- What is the utilization of the production line?

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!