Rank the Machine Centres in decreasing order of downtime duration. Trend individual machine downtime history on a monthly basis for entire duration (10% + 5%) A2. For the top three machine centres (from answer 1), generate two PARETO charts for each machine. (20%) The PARETO charts shall be 1. Cause of downtime vs. downtime events 2. Cause of downtime vs. downtime duration. EG 5220: Assessment 3 A3. For the most affected machine centre identified in Answer 1, analyse the causes of downtime from information available in the fields “Reason” and “Comments”. Explain your findings. (10% + 5%) A4. Generate two parameter Weibull Model for the three machine centres with highest downtime duration. Explain relative Reliability performance (15% + 5%)

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!