Group Project Description (Part 4)
PHASE 2. Design, Implementation and Maintenance of the System
Milestone III
1. Database Design – Chapter 9
2. Construction and Implementation. Your system code is written and tested at this stage, the system is installed – Chapter 13
3. Maintenance and Support User training and support is planned and provided (on a real or test situation); testing, maintenance and repairs. Revised Project Plan. | – Chapter 14
Database Design (10 Points) Group: ________________ Organization/System: ___________________
|_| 1. Create the relational DB for your sub-system
|_| 2. Any other documents and/or output from techniques that are useful to the design and not already listed.
Group members: _________ ___________ __________ _________ ___________
Please, sign
Construction and Implementation Group: _____________ Organization/System: ___________________
|_| 11-3-2. Write and test necessary programs. Include source code and/or SQL code (were appropriate)..
. Conduct (or describe your plan for) System Test for entire system, including other subsystems.
|_| 11-4-3. Install databases: fill them in with the data
|_| 11-98. Any other documents and/or output from techniques that are useful to the design and not already listed.
Group members: _________ ___________ __________ _________ ___________
Please, sign
Maintenance and Support 8 Group: _____________ Organization/System: ___________________
|_| 12-3. Identify and validate (a) problem(s) in the process of system operation. Generate System Service Request(s) for – system maintenance (error correction, benchmarking, debugging, testing) and/or – system recovery (after system “crash” or loss of data) Where possible, provide documentation on the actions that your group had accomplished from these requests.
|_| 12-5. Analyze possible system enhancement. Generate appropriate System Service Request(s) (use a model document from Phase 1).