Part 4
Instructions
Students will revise as required their previous submission based on instructor feedback, and then add the following three sections. The resulting submission will include all seven sections to date.
- Develop the Quality Management Plan. This anticipates who in the organization will take responsibilities for aspects of the project and their role. This will be used when the project implementation begins.
- This should be a spreadsheet or grid as found on pages 117 and 118 in the textbook.
- Assign Resources to the Project software document.
- Create a Communication Plan. Submit as a 1-2 page MS Word document or MS Excel document, using a grid plus text) See the example in Figure 4:10, page 122 of A Guide to the Project Management Body of Knowledge: PMBOK® Guide.
PMBOK is a registered mark of the Project Management Institute, Inc.
Reference PMBOK
Reference attached Docs