Task 1

Consider the following situation that had happened 3km away from the Kandy city.

Two adjacent city centres B and D receive water from separate sources A and C. The water level in A is 4 m above that in C. Reservoir A supplies city centre B by 0.4 m diameter pipe of 3000 m length with a level difference of 10 m. City centre D’s is supplied by reservoir C through a 4000 m long pipe of 0.45 m diameter, with a level difference of 15 m. After sometime it is found that centre B has excess water while centre D is starved.

Your company has come up with a solution to this issue.

They have proposed to interconnect these lines and draw 100 l/s from the line A to B. The junction on AB is at a distance of 2000 m from A. The junction CD is at 3000 m from C.

1) Determine the original supply rates and supply rates with interconnectionto centres B and D. Also determine

the diameter of the interconnecting pipe, if the length is 1500 m Friction factor, f = 0.01 in all cases.

Compare the results and evaluate the feasibility of the proposed solution.

 

Figure 1- Pipe Supply

 

2) Also, a compound manometer is used to measure the pressure in a pipe E carrying water. The dimensions are shown in the figure below. Determine the pressure in the pipe.

 

 

Figure 2- Manometer with the liquid

 

 

3) Illustrate a proposed solution to any similar hydraulic problem of your choice, using drawings or models

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!