#Sales Offer!| Get upto 25% Off:

Introduction

 

The purpose of this assessment task is to identify and analyse a public infrastructure failure. The failure

should have had a reasonable impact on the community it serviced. Some examples include:

  • A major pipe bursting
  • Dam failure
  • Structural failure
  • Road failure etc.

 

There are a multitude of further examples available, these are only a few. The nature of the topic should

endeavor to fall in the fields of civil or structural engineering, and as a guideline should be relatively recent

(in the last 50 years, 20 ideally).

 

The submission for this task is broken down in to an investigative report and a presentation.

 

Part 1: Investigative Report (15%)

The purpose of the report is to thoroughly document the failure, to identify the problems with the asset

management system which led to the failure (if identifiable) and to suggest improvements or changes to the

system in order to have successfully predicted and managed such an event. Some considerations could be

(but certainly are not limited to):

 

  • The cost of the failure, both in financial terms and in terms of safety, inconvenience etc.
  • The maintenance and monitoring routines for the asset prior to its failure. Would you deem this to be

adequate?

  • Changes in environment that may have led to a failure
  • Where the asset was within its life cycle at the time of failure
  • Any past rehabilitation work that had been done on the asset
  • Any investigation that took place post-failure.
  • Suggestions for an asset management system which would have prevented the failure

CRICOS Provider No. 00103D Insert file name here Page 1 of 2

 

 

Part 2: Presentation (10%)

 

This part of the assignment is a 5-10 minute summary of your report, presented to the class. This is to be accompanied by a PowerPoint presentation. Marks will be awarded based on the clarity of the speaker,

quality of information conveyed by the speaker, knowledge demonstrated and the quality of the PowerPoint

slides (placement of text and pictures, quality of dot-points etc.)

Further Notes

Although this assessment generally covers the area of asset management, it is entirely possible that risk and

quality management will also be relevant factors to consider in the investigation of the asset failure, as will

other topics in the ETCIV3100 unit. In general, students are encouraged to explore how their chosen topic

relates to all areas of infrastructure management as much as is possible.

Marks will be awarded for a coherent, logically structured and well-presented report that explores as much

relevant information on the chosen topic as possible. It is also advisable to make use of diagrams in both

parts of the assessment task.

 

For a custom paper on the above topic, place your order now!

What We Offer
• On-time delivery guarantee
• PhD-level professionals
• Automatic plagiarism check
• 100% money-back guarantee
• 100% Privacy and Confidentiality
• High Quality custom-written papers

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!