Using the tensile test data provided to you from the current and prototype production lies, write up a technical report regarding the state of the prototype production line in comparison to the current production line. Include assessments of the data, estimates of mean and standard deviation for each line, and estimates of the probability of a catheter testing below 7.0 N for each line. Do the probability estimate using the data in MATLAB and using the standard normal table and compare. Conclude with a recommendation to upper management on whether the production line is read to launch.
You should turn in a professional, technical report with assessment. Include relevant plots, analysis, and recommendations