Key Concept Exercise

(Oil and gas project portfolios)

After reading the given learning resources in the attached, In a 500-word response, address the following issues/questions:

· Analyse the different stages of the UK oil project you first analysed in previous Key Concept (please find in the attach) and create a high-level work breakdown structure for the project.

Note

· Word Count: 500 words

· Citation: Harvard Style (UK)

· Deadline: 06 December 2019 (10.00 pm BKK time)

Learning resources (To be read)

Journal

Berends, K. (2007) ‘Engineering and construction projects for oil and gas processing facilities: contracting, uncertainty and the economics of information’, Energy policy, 35 (8), pp. 4260-4270.

Davidsen, P., Sterman, J. & Richardson, G. (1990) ‘A petroleum life cycle model for the United States with endogenous technology, exploration, recovery, and demand’, System Dynamics Review, 6(1), pp. 66-93.

Vaquero, T.S., Sette, F., Silva, J.R. & Beck, J.C. (2009) ‘Planning and scheduling of crude oil distribution in a petroleum plant’, Proceedings of the ICAPS 2009 Scheduling and Planning Applications Workshop (SPARK), Thessaloniki, Greece.

Website

Gantt.com (2015) What is a Gantt chart? [Online]. Available from:https://www.gantt.com/ (Accessed: 05 December 2019).

US Department of Energy (2012) Work breakdown structure handbook [Online]. Available from:https://www.energy.gov/sites/prod/files/DOE%20WBS%20Handbook%20%202012-08-16.pdf (Accessed: 05 December 2019).

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!