Site Set-out
Review the drawingsPN20361 BAA Retail Complex. The concreters say they are having a problem with the set-out of this project with regards to the boundaries. Use drawing references to explain the problem relating to the boundaries and the actions to be taken to address the problem.
- This Project has multiple classifications of Buildings. Using the NCC/BCA, determine all of the applicable classifications for the project including a brief description of how you have made this determination.
- Identify the problem and discuss two possible solutions to the set-out and construction issue including who would be the professionals involved in the solution.
Your findings need to be presented in a report. Report must be typed and formatted.
How will I be assessed for this task?
For this task you are required to submit the following:
- Completed report outlining the above requirements
- Report must be typed and formatted