Your organization has determined that more resources are required to complete the project's risk management process for the expansion into China or another country approved by your instructor. Your team has been asked to perform a risk analysis, develop risk responses, and determine how the project will monitor and control risks.

Resource:Risk Breakdown Structure from Part I and University of Phoenix Material: Risk Project Log

Writea 10-12 slide PowerPoint presentation in which you do the following:

  • Identify the risks associated with the supplier expansion. Document those risks in the Risk Project Log template.
  • Perform a qualitative risk analysis using risk probability and impact analysis.
    • Perform quantitative risk analysis.
  • Determine and document the criteria used to determine which risks will have a risk response plan.
  • Outline the timing–when and how often–of the risk management process in the project life cycle, including risk monitoring and controlling processes. Consider the following:
  • Risk reassessment
  • Risk audits
  • Status meetings

Formatyour presentation consistent with APA guidelines.

UtilizePowerPoint's slide notes to thoroughly explain your slides (you cannot receive full credit without slide notes)

Includea reference slide (with peer reviewed references) and a conclusion slide.

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!