Quality Consulting has two consultants, Alfred and Barbara that can be scheduled to work for clients up to a maximum of 170 hours each over the next four weeks. A third consultant, Charlie, has some administrative assignments already planned and is available for clients up to a maximum of 150 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four- week period are:

Client

Hours

A

180

B

75

C

100

D

85

 

Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant’s experience. The rates (dollars per hour) for each consultant-client combination are as follows:

Client

Consultant

A

B

C

D

Alfred

100

125

115

100

Barbara

110

135

115

110

Charlie

155

140

140

130

 

 

1) Develop a network representation of the problem. You may reference the Network Diagram Template.

 

2) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm’s billings. What is the schedule and what is the total billing?

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!