1.For an Embedded product, the requirements are well defined and are within the scope and no change requests are expected till the completion of the life cycle. Which is the best-suited life cycle model for developing this product?
(a) Linear (b) Iterative (c) Prototyping (d) Spiral
2. Which of the following is(are) not a feature of prototyping model
(a) Requirements refi nement (b) Documentation intensive
(c) Intensive Project Management (d) Controlled risk
3. An embedded product under consideration is very complex in nature and there is a possibility for change in requirements of the product. Also the risk associated with the development of this product is very high. Which is the best-suited life cycle method to handle this product development? (a) Linear (b) Iterative (c) Prototyping (d) Spiral1. What is EDLC? Why EDLC is essential in embedded product development?