Your team is about to organize a live music concert at the FTU campus sponsored by big partners of FTU. This is the first big event for students after the coronavirus outbreak. The concert is budgeted at VND 200 mil. The Board of Management hopes that this event will mark an unforgettable memory for FTU students after a long time of locking down. However, for safety reasons, the concert will be conducted online and offline, with a maximum of 500 students being present at the open-air stage. The rest will join online with a qualified Internet connection. You will use touchless tools to sell tickets and collect tickets at the concert.
1. Prepare the scope statement (project objectives, deliverables, milestones, scope, and constraints) of the project.
2. Develop the WBS of the project (with at least 10 Workpages).
3. Develop the network diagram, estimate tasks duration, and use the CPM to identify the shortest time to complete the project.