Your company, a leading industrial power generator supplier has been contacted by Samsung Heavy Industries at 2330 (perth time). One of their Drill ships operating in the Santos Basin, about 250km off the coast of Rio de Janeiro has had a major electrical failure. In order to salvage the situation, they need to fly in a backup load bank (6250 KVA) within 48 hrs. The loadbank is containerized in a standard 20 (ERP) system and find that a similar generator is located at the regional HQ in Batam (Indonesia). The technical person who has the knowledge to set up and operate the equipment is currently in Busan (Korea) on another project.
You have only 48 hrs to have the equipment delivered to the client in the Santos Basin for installation. Describe the key challenge you would anticipate. How would you overcome these?

 

For a custom-written paper on the above topic, place your order now!

What We Offer
• On-time delivery guarantee
• PhD-level professionals
• Automatic plagiarism check
• 100% money-back guarantee
• 100% Privacy and Confidentiality
• High Quality custom-written papers

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!