1.A small hydro project gets a continuous, steady, uniform, regulated supply

 

of V m3/hour on all the 7 days of a week from a reservoir to its forebay.

The hydro plant works 5 days a week for 8 hours per day. The pondage

required at the forebay is

(a) 96 V m3 (b) 56 V m3 (c) 48 V m3 (d) 64 V m

2. Consider the following statements:

A surge tank provided on the penstock connected to a water turbine

(1) helps reduce the water-hammer effect in a section of the penstock

(2) stores extra water when needed

(3) provides increased demand of water when needed

Which of these statements are correct?

(a) 1, 2 and 3 (b) 2 and 3 (c) 1 and 2 (d) 1 and 3

3. The function of a surge tank is to

(a) avoid reversal of flow

(b) reduce the water-hammer effect in a major section of the pipeline

(c) prevent occurrence of mass oscillation of water

(d) smoothen the flow

4. A surge tank is provided in a hydropower plant to

(a) to strengthen the penstocks

(b) reduce length of pipe affected by water-hammer pressure

(c) reduce frictional losses in the penstocks

(d) increase the net head

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!