The impact of information technology on the banking system

( chose any project and ensure it provide the deliverables below for grading purposes)

Project Deliverables

The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the phase 3, students are required to use the MS Project software for their project schedule.

The deadline for the Individual Project can be found in the schedule section of the class syllabus.

The following layout format covering a title page and all three phases is recommended for the project.

Title page (project name, author, and date)

Phase 1: Requirement analysis

A. Problem definition

B. Issues

C. Objectives

D. Requirements

E. Constraints

F. Description of the proposed system

G. Logical model design

  1. Data flow diagrams
  • Context diagram
  • Diagram 0
    • Diagram 1 (Diagram 1 is optional)
  • Descriptions of processes in each diagram
    1. Descriptions of outputs/inputs/performance/security or controls

H. Specific requirements, if any (interface, operational, resource, performance, etc.)

Phase 2: System and database design

A. User interface

Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system.

  1. How data will be input to the system?
  • The physical layout for each input
  • The input design and procedures
    1. How data will be output from the system?
  • The physical layout for each output
  • The output design and procedures

B. Data design

Develop a plan for data organization, storage, updating, and retrieval.

  1. Database design
  • Database tables with their attributes should be presented
  • Primary key(s) should be identified in each table, if any
  • Three steps of normalization should be included.
  1. Entity-relationship diagrams
  2. Data file storage and access

C. System architecture

Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc.

Phase 3: Project plan

A list of tasks or activities needed for implementing the proposed system

Estimating completion time and costs

A project schedule for performing those activities (Gantt charts or PERT charts)

Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software.

Individual Project Rubric

The individual project will account for 25% of your total points possible and students should use the APA format for the format of the individual project reports

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!