Prepare a report:
Topic: Change requirement and Project life cycle
Maximum 3000 words
The report should be structured using an appropriate business style / format with maximum of 3000 words. The key contents of the report should include but not limited to:
Change request analysis;
Change details in the project management processes and each stage of project life cycle;
Integrated change control; and justifications to the required changes that occur.