. The company has successfully achieved planning permission for a new training facility and has requested that you submit a design proposal for the full mechanical and electrical systems for the company’s office building.
Detailed Design:
For your selected subsystems, Refrigeration and Cooling system and Heating system. You must produce a detailed report outlining design decisions and rationale for the technologies you have selected in support of the final design which should include the following elements.
a) Use of fundamental knowledge, innovative techniques, system selection, design parameters
b) Creative logical approach, attention to detail and functional efficiency
c) An outline performance specification and all design calculations associated with selection of components, sizes, capacity and duty
d) Layout of plant rooms, major equipment location, pipe, cable and duct runs throughout the building and site
e) Special features of installation relating to health and safety, good engineering practice, and building regulations
f) Operating and maintenance criteria for major plant
g) Draw all the services to scale on the CAD plans provided
h) Low/Zero carbon and energy efficiency
i) Installation and maintenance issues
j) Commissioning schedules
k) Integration with the order subsystems within the full building services project
IMPORTANT NOTES
Please submit both hard copy and soft copy of your PowerPoint slides for presentation