Monitoring
- Describe the methods for monitoring solution implementation using the steps of the model you chose.
Evaluation
- Describe the methods to be used to evaluate the solution.
Outcome Measure:
- Develop or revise an outcome measure that evaluates the extent to which the project objective is achieved. A copy of the measure must be included in the appendix.
- Describe the ways in which the outcome measure is valid, reliable, sensitive to change, and appropriate for use in this proposed project.
Evaluation Data Collection:
- Describe the methods for collecting outcome measure data and the rationale for using those methods.
- Identify resources needed for evaluation.
- Discuss the feasibility of the evaluation plan.
Format your paper consistent with APA guidelines. Include a minimum of 4 scholarly references from the University Library and 1,050-1,400 words.
Submit the assignment as directed by the instructor.
Note. Points are awarded based on the quality of the content submitted and the degree to which assignment expectations are met.
Content
8 points possible |
Points possible | Points earned |
Description of valid, reliable outcome that is sensitive to change and appropriate for use in the proposed project | 2 | |
Discussion of methods used to monitor implementation of the project within the model selected for the proposed project. | 2 | |
Discussion of methods used to evaluate the solution | 1 | |
Description of resources and methods to collect outcome data and rationale for using the methods. | 2 | |
Discussion of the feasibility of the evaluation plan | 1 | |
Format
2 points possible |
Points possible | Points earned |
Follows rules of grammar, usage, and punctuation | 2 | |
Has a structure that is clear, logical, and easy to follow | ||
Consistent with APA guidelines for formatting and citation of outside works | ||
Contains the required word count | ||
Cites the required number of sources | ||
Total | 10 |