Well points are to be used to dewater a large trench excavation that

extends 10 m below the surface of the water table. Assume that the

bottom width of the trench excavation is 20 m.

(1) Develop a simple sketch of the necessary two-stage well point sys-

tem. Use separate diagrams to show the progress of the necessary

stages of installation.

(2) Assume that half of the necessary lowering of the water table eleva-

tion is achieved using the outer row of well points. If the soil being

dewatered is a fine-to-medium sand, approximately at what dis-

tance beyond the well point location is the original groundwater

table that is not affected by well point dewatering?

Found something interesting ?

• On-time delivery guarantee
• PhD-level professional writers
• Free Plagiarism Report

• 100% money-back guarantee
• Absolute Privacy & Confidentiality
• High Quality custom-written papers

Related Model Questions

Feel free to peruse our college and university model questions. If any our our assignment tasks interests you, click to place your order. Every paper is written by our professional essay writers from scratch to avoid plagiarism. We guarantee highest quality of work besides delivering your paper on time.

Grab your Discount!

25% Coupon Code: SAVE25
get 25% !!