Order instructions
This assignment consists of two (2) sections: a business requirements document and a Gantt chart or project plan. You must submit both sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment for which it is written. Additionally, you may create and / or assume all necessary assumptions needed for the completion of this assignment.
Procuring quality business requirements is an important step toward the design of quality information systems. Completion of a quality requirements document allows user needs and expectations to be captured so that infrastructure and information systems can be designed properly. Using the requirements document provided in the course shell, you are to speculate on the needs of the company. You must consider current and future requirements; however, assumptions should be realistic and carefully considered.
Section 1: Business Requirements Document
- Write an eight to ten (8-10) page original business requirements document for the project plan using the template provided. Note: The template can be found in the Student Center of the online course shell.
- Describe the project including the following:
- Describe the scope and analyze how to control the scope.
- Identify possible risks, constraints, and assumptions.
iii. Describe the integration with other systems and infrastructure. Note: Database and interface design, security, and networking should be considered.
- Define relevant terms that will be used throughout project.
- Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
- Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
- Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
Section 2: Revised Gantt Chart / Project Plan
Use Microsoft Project or an open source alternative, such as Open Project, to:
- Update the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.
The specific course learning outcomes associated with this assignment are:
- Apply integrative information technology solutions with project management tools to solve business problems.
- Use technology and information resources to research issues in information technology.
- Write clearly and concisely about strategic issues and practices in the information technology domain using proper writing mechanics and technical style conventions.
Grading for this assignment will be based on answer quality, logic/organization of the paper, and language and writing skills, using the following rubric found here.
Points: 150 | Project Deliverable 2: Business Requirements Document | ||||
Criteria | Unacceptable
Below 60% F |
Meets Minimum Expectations
60-69% D |
Fair
70-79% C |
Proficient
80-89% B |
Exemplary
90-100% A |
Section 1: Business Requirements Document | |||||
1ai. Describe the scope and analyze how to control the scope.
Weight: 15% |
Did not submit or incompletely described the scope and did not submit or incompletely analyzed how to control the scope. | Insufficiently described the scope and insufficiently analyzed how to control the scope. | Partially described the scope and partially analyzed how to control the scope. | Satisfactorily described the scope and satisfactorily analyzed how to control the scope. | Thoroughly described the scope and thoroughly analyzed how to control the scope. |
1aii. Identify possible risks, constraints, and assumptions.
Weight: 20% |
Did not submit or incompletelyidentified possible risks, constraints, and assumptions. | Insufficiently identified possible risks, constraints, and assumptions. | Partially identified possible risks, constraints, and assumptions. | Satisfactorily identified possible risks, constraints, and assumptions. | Thoroughly identified possible risks, constraints, and assumptions. |
1aiii. Describe the integration with other systems and infrastructure.
Weight: 20% |
Did not submit or incompletely described the integration with other systems and infrastructure. | Insufficiently described the integration with other systems and infrastructure. | Partially described the integration with other systems and infrastructure. | Satisfactorilydescribed the integration with other systems and infrastructure. | Thoroughly described the integration with other systems and infrastructure. |
1aiv. Define relevant terms that will be used throughout project.
Weight: 15% |
Did not submit or incompletely defined relevant terms that will be used throughout project. | Insufficiently defined relevant terms that will be used throughout project. | Partially defined relevant terms that will be used throughout project. | Satisfactorily defined relevant terms that will be used throughout project. | Thoroughly defined relevant terms that will be used throughout project. |
1b. 2 references
Weight: 5% |
No references provided | Does not meet the required number of references; all references poor quality choices. | Does not meet the required number of references; some references poor quality choices. | Meets number of required references; all references high quality choices. | Exceeds number of required references; all references high quality choices. |
Section 2: Revised Gantt Chart / Project Plan | |||||
2. Update the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks.
Weight: 15% |
Did not submit or incompletelyupdated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks. | Insufficiently updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks. | Partially updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks. | Satisfactorily updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks. | Thoroughly updated the Gantt chart or project plan (summary and detail) template, from Project Deliverable 1: Project Plan Inception, with all the project tasks. |
3. Clarity, writing mechanics, and formatting requirements
Weight: 10% |
More than 8 errors present | 7-8 errors present | 5-6 errors present | 3-4 errors present | 0-2 errors p |