1.During a certain week, a hydropower plant produces 8,400,000 kWh of energy

 

and the peak-load during that week is 100,000 kW. What is the load factor during the week?

(a) 40% (b) 45% (c) 50% (d) 60%

2. Pumped storage plants

(a) use thermal energy to pump water and generate hydropower to meet peak\ demand

(b) allow thermal power to take up peak-load while the hydropower can take up the baseload

(c) convert low value off-peak energy into high-value on-peak capacity and energy

(d) convert low value thermal power into high-value hydropowerO8.11 * A pumped storage plant is always a

(a) high-head plant (b) run-of-river plant

(c) peak-load plant (d) base-load plant