Discuss the steps involved in setting out the positions of piers of a bridge.

A.Discuss in details the steps involved in setting the centre line of bridges.

 

B. Discuss the steps involved in setting out the positions of piers of a bridge. 14.1 Setting out is done

(a) prior to the preparation of plans

(b) along with the preparation of plans

(c) after the preparation of plans

(d) if obstructions are present

C. Which of the following is associated with the setting out of sewers and pipe lines?

(a) Batter-board (b) Cross-staff

(c) Cross-head (d) optical square

D. Pegs or stakes are not generally fixed at the exact corner of the buildings because

(a) it is difficult to set them there

(b) they might be lost during the excavations

(c) they are not required at corners

(d) they are made of wood and may rot

find the cost of your paper

Explain why of length-of-bend to sheet thickness increases.

As noted in Fig. 7.16, the state of stress shifts from plane stress to plane strain as the ratio   of length-of-bend to sheet thickness increases. Explain why. This situation….

Describe the material properties that have an effect on the relative position of the curves shown in Fig. 7.19.

Describe the material properties that have an effect on the relative position of the curves   shown in Fig. 7.19. Observing curves (a) and (c) in Fig. 7.19 on p…..

Why do tubes have a tendency to buckle when bent?

Why do tubes have a tendency to buckle when bent? Experiment with a straight soda straw, and describe your observations. Recall that, in bending of any section, one-half of the….